Olympic Swim Trials | Omaha, Nebraska

In 2012, the U.S. Olympic Swim Team brought home 31 medals from the London games. It all started at the Omaha Olympic Trials, where America’s finest athletes competed in pools designed by Arch Pac. Two Myrtha stainless steel pools were assembled in eight days by DWR Construction Inc., used for the two-week trials, and then disassembled in three days.

Time lapse video -– pool built in 8 days 