ArchPac

2012 Olympic Trials Pools

Educational Pools | Community Pools | Renovations | Water Parks | Resorts & Spas | Olympic Trials
         
Time lapse video – pool built in 8 days

In 2012, the U.S. Olympic Swim Team brought home 31 medals from the London games. It all started at the Omaha Olympic Trials, where America’s finest athletes competed in pools designed by Arch Pac. Two Myrtha stainless steel pools were assembled in eight days by DWR Construction Inc., used for the two-week trials, and then disassembled in three days. Arch Pac will oversee permanent installation of the pools at Charles River Aquatics near Harvard University and the Omaha Sports Complex.

     
 
Click on thumbnail to see larger picture