San Joaquin Delta College | Stockton, California
Arch Pac renovated this 52-meter x 25-yard pool from top to bottom, including a new movable bulkhead, underwater observation area, and decking. The moveable bulkhead allows the pool to be configured so that two types of competitive events can take place at the same time.